Fabrication Plant
Terrebonne, QC Canada
Our Facilities
To remain among the most innovative and productive in the industry, ADF has invested in new robotic equipment. These state-of-the-art equipments maximize the use of raw materials, increase productivity and enhance production capacity to meet the most demanding deadlines.
The plant has a total of 10 bays dedicated to production, one of which is fully automated. Our Terrebonne facility can simultaneously handle multiple large-scale and complex projects.
Our facilities also include a cutting-edge paint shop.
0
ft2
0
m2
Site Area
0
ft2
0
m2
Covered Facilities
0
Tons
Annual Production Capacity
0
Tons
Lifting Capacity
Area Served
Our facilities are strategically located near main road, rail and maritime transportation links.
Our Terrebonne facility serves a vast territory that extends from Northeastern Canada to the central and southeastern United States.
Certifications
- CWB – Canadian Welding Bureau:
- ISO 9001:2015
- CSA W47.1 – Division 1
- AISC – American Institute of Steel Construction:
- Building Fabricator
- Bridge Fabricator – Advanced
- Fracture Control Endorsement
- Complex Coating Endorsement 1 – Enclosed
- Erector
- Metal Deck Endorsement