Skip to content

Terminal C at Raleigh Durham International AirportRaleigh, NC

Raleigh, NC, United States – 12,000 tons

Owner

Raleigh-Durham Airport Authority

Client

Archer Western Contractors, Ltd.

Architecture

Archer Western Contractors, Ltd.

Engineering

Arup

This multi-phase contract awarded to ADF covered connection design and engineering, fabrication, and installation of metal structures and of the roof structure as part of the Terminal C expansion project.
This 12,000-ton project required fabrication of heavy steel assemblies and more than 60 visible roof trusses made of steel and laminate wood, the largest of which spans 131 meters (430 feet), and which were equipped with a cable system.